PENGARUH KETERLAMBATAN PENGADAAN SUKU CADANG TERHADAP PERAWATAN BERENCANA DOCKING KAPAL DI PT ARGHANIAGA PANCATUNGGAL

Show simple item record

dc.contributor.author FAUZIA, NAJWA AZIZUL
dc.date.accessioned 2025-09-22T01:21:20Z
dc.date.available 2025-09-22T01:21:20Z
dc.date.issued 2025-06-05
dc.identifier.uri http://repository.stipjakarta.ac.id//handle/123456789/5233
dc.description.abstract Fauzia, Najwa Azizul. 2025. "The Impact of Spare Part Procurement Delays on Planned Ship Docking Maintenance at PT Arghaniaga Pancatunggal.” Maritime transportation plays a critical role in underpinning the global economy, and PT Arghaniaga Pancatunggal, as an active participant in this sector, must ensure vessel safety through meticulously planned docking maintenance. The efficacy of this maintenance is intrinsically linked to the timely acquisition of necessary spare parts. This research endeavors to analyze the influence of delays in spare part procurement on the scheduled docking maintenance of ships at PT Arghaniaga Pancatunggal. Employing a quantitative research design with simple linear regression analysis, the study gathered primary data through questionnaires administered to 38 respondents, comprising both ship crew and shore-based employees, drawn from a target population of 60 individuals. The statistical analysis revealed a significant positive correlation between spare part procurement delays and planned ship docking maintenance (r = 0.754, p < 0.05), indicating that 56.8% of the variance in maintenance outcomes can be attributed to these procurement delays. The study recommends the strategic implementation of an integrated Enterprise Resource Planning (ERP) system to optimize the synchronization of spare part procurement and maintenance schedules, thereby enhancing operational timeliness. Furthermore, it advocates for the cultivation of stronger, more collaborative relationships with suppliers to proactively mitigate the occurrence and impact of procurement delays. Ultimately, this research offers valuable empirical insights for enhancing operational efficiency and the strategic management of spare part acquisition within the broader maritime industry en_US
dc.language.iso other en_US
dc.publisher Sekolah Tinggi Ilmu Pelayaran en_US
dc.subject procurement delay en_US
dc.subject planned ship docking maintenance en_US
dc.title PENGARUH KETERLAMBATAN PENGADAAN SUKU CADANG TERHADAP PERAWATAN BERENCANA DOCKING KAPAL DI PT ARGHANIAGA PANCATUNGGAL en_US
dc.type Thesis en_US